2011 Roadtec RP170 Wheel Asphalt Paver The last reported number of hours was 5628. Hours and condition are captured at the time of listing and are subject to change. Please contact a representative about this piece of equipment for an updated reading.
Canopy
Dual Controls
Fume Extractor
Tier 3
Road Tech S-8 Electric Heated 8 ft - 14 ft Screed
On Board Generator
Sensor Ski
Emulsion Tank
Serial Number / VIN: RP-170-144
Hour Meter / Odometer: 5628 hrs
Exterior Lights: Operational
Travel Alarm: Operational
Horn: Operational
Seat Belts: Not equipped
Safety Lock Out/Stop: Operational
Current Safety Manual: No
Current Operator/Maintenance Manual: No
Oil Pressure: The gauge registers in the operating range.
Warning Lights: Operational
Screed Control Switches: Operational
Gauges: Operational
Limited Function Check: The main components are in place and operational as noted.
Engine: No US EPA Label Present
Blow-by (subjective visual observation): No noticeable vapor or pressure
Starter: Operational
Oil Leaks: Valve cover
Fuel Leaks: No dripping leaks
Cooling System Leaks: No dripping leaks
Limited Function Check: The engine started and ran.
Drivetrain #1: Hydrostatic Drive
Limited Function Check: The drivetrain was operational.
Screed Vibrators: Operational
Limited Function Check: The hydraulic system was operational.
Screed Serial Number: Serial Number: S-8EH-132
Metering Gates: Powered
Screed Heaters: Not operationally checked
Screed Slope Adjustment: Powered adjustment, Operational
Screed Crown Adjustment: Manual adjustment, Not operationally checked
Screed Tow Point Adjustment: Powered adjustment, Operational
Mat Thickness Adjusters: Manual adjustment, Not operationally checked
Spray Down System: Not operationally checked
Limited Function Check: The main components were operational in a limited check.
date of analysis: Apr 09, 2026
Silicon: 0 PPM
Tin: 0.46 PPM
Silver: 0 PPM
Aluminum: 0.52 PPM
Chromium: 0.27 PPM
Lead: 0.84 PPM
Copper: 2.56 PPM
Nickel: 0.22 PPM
Iron: 13 PPM
Glycol: NEG
Water: NEG
Fuel: <5%
For your convenience, we've included these documents free to download so you can make the best decision.
| FINAL SELLING PRICE | TRANSACTION FEE |
|---|---|
| $1 to $25,000 | 10% of the final selling price (min $100) |
| $25,000 to $75,000 | 5% of the final selling price (min $2,500) |
| Above $75,000 | $3,750 |
Speak with an expert. 7 days a week.
Call: (888) 313-1597
1220 hours
$18,000
1198 hours
$170,000
6964 hours
$24,500
7655 hours
$53,074
1138 hours
$179,000
6873 hours
$42,135
1071 hours
$140,000
3504 hours
$45,645
View more
1220 hours
$18,000
1198 hours
$170,000
6964 hours
$24,500
7655 hours
$53,074
1138 hours
$179,000
6873 hours
$42,135
1071 hours
$140,000
3504 hours
$45,645
View more