Powerhouse Protection
Our buyer guarantee protects your purchase against anything missed during inspection.
Warranty available
Our buyer guarantee protects your purchase against anything missed during inspection.
Buy now, pay later for well qualified borrowers. Don't let heavy cost slow you down.
This machine currently has 2,300 hours of operation on one light rail tunnel project. It has been meticulously maintained, and all of the applicable Performance Improvement Programs (PIP) have been installed by a local Liebherr dealer.
Automatic Fire Suppression System
Automatic Central Lubrication System
Air Pre-Filter with Dust Trap
Reversible Fan Drive
Emergency Engine Shut-Down on Both Sides
Additional Headlights on Counterweight & in the Engine Hood on the Upper Carriage
Enclosed Cab for Tunnel Use
Emergency Rear Exit Window
Automatic Air Conditioning System
Rear & Side Side View Cameras
Engine: Liebherr D944 A7-24 201Hp 8L I4 TurboD
Hi + Low Planetary Reduction Drive
Tier 4 Final Emissions with SCR (Aftertreatment Only)
Hydraulic Relief: 5076 psi
Hydraulic Capacities: Tank- 77 gal / System-137 gal
Track Links: 49 - Double Grouser
Attachment: Ripper Demolition Bucket - 35 in, 1+2 Teeth
Track & Carrier Rollers: 9 Track & 2 Carrier Rollers (Per Side)
Dozer Style Wide Blade - 188 in
Tunneling Attachment Kit for Cutting Head
LED Lights on Engine Cover, Boom, and Rear Headlights
Hydraulic Quick Coupler
Auxiliary Hydraulics & Auxiliary Lights
Windshield Grille Guard
For your convenience, we've included these documents free to download so you can make the best decision.
4 hours
$34,995
4 hours
$34,995
4 hours
$34,995
4 hours
$34,995
4 hours
$34,995
4 hours
$34,995
4 hours
$105,450
4 hours
$105,450
4 hours
$34,995
4 hours
$34,995
4 hours
$34,995
4 hours
$34,995
4 hours
$34,995
4 hours
$34,995
4 hours
$105,450
4 hours
$105,450